HILL ROAD SUBDIVISION-POWDER SPRINGS, GA
The scope of this work at this large subdivision consisted of installing 6 inches of GAB base material, 2 inches of 19 mm asphalt binder, then 1.5 inches of 12 mm asphalt topping.
Additional work also included DOT de-cel lane paving with 10 inches of GAB base material, 4 inches of 25 mm asphalt binder, 2 inches of 19 mm asphalt binder, and 1.5 inches of
12.5 mm asphalt topping.