Project Overview
Roswell United Methodist Church
The scope of work on this very large church project required us to edge mill and Perma-Flex Pave approximately 29,000 square yards of existing pavement. Some unstable areas were saw-cut, excavated, and repaired with 2 inches of 19 mm asphalt binder prior to paving. After all paving was complete our crews layed out and striped all paved areas. A separate Youth Building lot was repaired; all cracks sealed with a hot pour, rubberized sealant; sealcoated with 2 coats of refined tar based sealant, then re-striped.