Project Overview
PRESERVE AT DOVE CREEK-STATHAM, GA
Dove Creek is a large subdivision under construction north of Atlanta. Specifications called for 8 inches of GAB, followed by 2 inches (compacted thickness) of 19 mm asphalt base binder. Approximately 10,000 tons of GAB was installed by one of our base crews, then 2 of our paving crews completed this phase by installing 2,300 tons of the asphalt binder in ONE DAY!
The final layer of asphalt topping will be installed once the developer has completed the construction of the homes.